Dismantling of PHF Gantry Crane

Sector
Infrastructure
Location
Yanbu Port
Client
Saipem

01

Project overview

At Yanbu Port, Strong Point dismantled the PHF gantry crane.

02

Scope

  1. 01Controlled lowering of the main gantry beam
  2. 02Detaching and bringing down the legs and remaining structure in a planned sequence
  3. 03Laying all sections down on cribbing, secured for removal from site

03

Execution

The main gantry beam was lowered in a controlled manner, then the legs and remaining structure were detached and brought down in a planned sequence. All sections were safely laid down on cribbing, secured and made ready for removal from site.