Handling & Installation of Three Power Transformers
- Sector
- Infrastructure
- Location
- Al Khobar
- Client
- SSEN
01
Project overview
Strong Point handled and installed three power transformers onto their foundations.
02
Scope
- 01Offloading three power transformers
- 02Jacking and skidding each unit
- 03Setting each unit into its final position on its foundation
03
Execution
Each unit was offloaded, jacked, skidded and set into its final position with millimetre accuracy. The operation was delivered safely and on schedule, ready for electrical hook-up.